2026
East Grand Lake Project
-
2026
Pat's Throat
-
2025
Army Corps MOU
Memorandum of Understanding signed with the US Army Corps New Orleans District
-
2023
Lost Lake - Win
-
2021
Lost Lake - Third dam attempt
-
2020
Bayou Bridge Pipeline
-
2020
Grand Lake
-
2019
Bayou Bridge Pipeline
-
2019
EPA Petition
-
2015
Lost Lake - Second dam attempt
-
2011
Grand Lake
-
2009
Lost Lake - Win
Illegal developer agreed to remove the illegal dam, pumps and boathouse. Charges were dismissed.
-
2008
Lost Lake
ABK & LCPA-West filed lawsuit challenging USACE after-the-fact permit
-
2007
Bayou Postillion
Proposed in 2004 as the first "water quality" project in the Atchafalaya Basin. The project was re-designed as an access canal to benefit an oil company, creating 1 mile of solid spoil banks that trap water and lead to further water quality declines. ABK & LCPA-West filed a lawsuit challenging the projects lack of compliance with permit conditions. It was dismissed for lack of standing.
-
2006
Lost Lake
First illegal dam placed
-
2005
Bayou Sorrel Oil Rig
ABK prevented the dumping of produce waters
-
2004
Founding of Atchafalaya Basinkeeper
atchafalaya Basinkeeper was founded as a non-profit organization and member of the Waterkeeper alliance
-
1999
Cypress Shield Campaign
The Atchafalaya Basin Coalition organizes to protect cypress trees from logging to make mulch
-
1982-1999
Dean works as a professional crawfisher
Dean works as a professional crawfisher
-
1982
Dean Wilson moves to the Basin
Dean moves to Louisiana to live off the land